I pressure washed the outside of a BPS, with that bloody heavy ass lance, that was 3 sotrys high give or take, with a WFP absolutely no problem.


75DEFE28-E95C-4243-828F-9EF541C4F6A0_zpsppmq05sf.gif


I'm buggered if I could :sweating:

 
Also who in their right mind is going to hand you 18 grand for doing that job:laugh:

For 18 grand smurf I would MAKE it work, wouldn't matter if I only cleaned a meter a day for that money.
 
For 18 grand smurf I would MAKE it work, wouldn't matter if I only cleaned a meter a day for that money.
The bloke wants it done good and done quick I'm looking to be there for a week lol

Sent from my iPhone using Tapatalk

 
Really? you must have tiny hands, the end of the narrow tool on mine is less than an inch, if that can't get in no way I am getting a hand on lol, my finger is about the same width as the narrow tool.
If the tiles are over hangings out tool may fit in front of the tiles but not underneath where there is build up of ****

Sent from my iPhone using Tapatalk

 
Have you done many 3-4 storey jobs?

Still not getting why a gutter vac wouldn't;t work to be honest.
I pressure washed the outside of a BPS, with that bloody heavy ass lance, that was 3 sotrys high give or take, with a WFP absolutely no problem.
 
You use the patent pending "wiggle" I have experimented a lot with a house that was like it, wiggle the pole forwards and backwards and it gets it.

 
So back to original question how much would you charge if you was up scaffold to do a proper job?

Sent from my iPhone using Tapatalk

 
That's what I was going to say but wanted other peoples opinions

Sent from my iPhone using Tapatalk

 
Was just about to ask what tuffers said [emoji115][emoji115] I reckon 2 days max

Sent from my iPhone using Tapatalk

 
I would feel like a complete **** and would stretch it out a bit just to make it look like he got his money worth, but still charge the same.

 
Jobs like that are usually scheduled in with other works like roofing repairs, window replacements etc so kills two birds with one stone and all that:rolleyes:

 