Jump to content

Don't want to see ads? Become a subscribed member.

Twin Ro Setup


mikey2703

Recommended Posts

I'm assuming you mean in parallel as opposed to series (One after the other). In which case, simple T-junction before and after the RO's to split the single feed into two and the dual output into one. Pressure may become an issue if your 4040's aren't pumped and also if your mains tap will supply enough pressure/water could be worth finding out before hand.

Link to comment

Id put them in parallel mate....

Feeding your waste to the next membrane will decrease the life of the second alot faster (waste water tds is alot higher than tap tds)

In parallel, both membranes would have the same input tds and youd get the same productivity as having them in line, if not more as your pressure would be higher

Link to comment

Don't want to see ads? Become a subscribed member.


Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Ad Blocker Detected

Please disable your ad blocker

Our forum relies on ads to pay for the servers and our time maintaining and running the forum.

Sadly running a forum like this is not free, and due to our popularity, we need servers that can handle the amount of traffic and resources our forum uses.

 

If you do not wish to see ads on our site, please consider supporting the forum with a membership subscription.

 

Accept