Glazenwasser (.NL)
Well-known member
- Messages
- 101
- Location
- Netherlands
Hi guys... I have been looking into why we do what we do and why.
Now we buy kds at prices between 4 and 6 a bag...when a normal bag of the same type and weight will cost say 2..... we pw then wait days for the ground and slabs, bricks, tiles to dry....
Now looking at slurry, we pour that wet....why not clean a drive and when finished .... layout the sand and flood the area and broom in the sand.
I was talking with a retired career road layer the other day and he told me this used to be how they did driveway refurbs years ago here in The Netherlands.
I have a patio and driveway here and the stones I have are 200mmx40mm and the gaps are about 5mm average and the depth of gap is 30mm approx.
I have tried this method both with kds, it's normal damp type coarser sand grit combo ... so kds laid in dry as per normal after allowing for drying out, also laying in sand straight after cleaning without waiting for drying.
Conclusion from this?.... same same.
So if indeed it's all the same....why clean then return 2,3 days or longer to sand with expensive sand when you can finish the same day...Job and knock?
Without wanting to sound like a complete d#$% would prefer to hear about actual experiences, you never know we could all be making more cash for the same job just by doing things differently i.e no expensive kds, no returning to customers house etc,etc
Cheers Dave.
Now we buy kds at prices between 4 and 6 a bag...when a normal bag of the same type and weight will cost say 2..... we pw then wait days for the ground and slabs, bricks, tiles to dry....
Now looking at slurry, we pour that wet....why not clean a drive and when finished .... layout the sand and flood the area and broom in the sand.
I was talking with a retired career road layer the other day and he told me this used to be how they did driveway refurbs years ago here in The Netherlands.
I have a patio and driveway here and the stones I have are 200mmx40mm and the gaps are about 5mm average and the depth of gap is 30mm approx.
I have tried this method both with kds, it's normal damp type coarser sand grit combo ... so kds laid in dry as per normal after allowing for drying out, also laying in sand straight after cleaning without waiting for drying.
Conclusion from this?.... same same.
So if indeed it's all the same....why clean then return 2,3 days or longer to sand with expensive sand when you can finish the same day...Job and knock?
Without wanting to sound like a complete d#$% would prefer to hear about actual experiences, you never know we could all be making more cash for the same job just by doing things differently i.e no expensive kds, no returning to customers house etc,etc
Cheers Dave.
Last edited by a moderator: