Hi all ok this is my first potential big contract!
I have been asked to do three blocks of flats 2 houses and 2 bungalows.
Block 1 has around 85-100 windows average size most about 3ft 5ft
Block 2 very similar but about 60 windows of same size
Block 3 has around 20-30 windows again about the same size
I roughly know what i will charge on bungalows etc but could do with some real help on the blocks of flats.
I have added a pic of one the front of the biggest block the back is the same each of the sides of the block has about 9 of the smaller windows and 3 of the 3 pain windows.
What sort of prices would you guys be charging?
Prices for the biggest (pictured) block is fine or if you like a price on whole job?
I know it is hard to say but my first big contract that i could really do with now so want to make sure i get it right.
Oh it is monthly clean and will be a 12 monthly contract.
Any suggestions about contracts etc welcome not had one before no idea of the formalities etc.
Oh another thing is i will have to get a new pole if i get this job as my slx 25 is not high enough i need like another 5-10ft can i just get another bigger section to go on bottom to add that or will i need new pole.
I know it is a bit of an ask but need to get back to them ASAP and don't want to royally F the price up, i know roughly what i would charge but wanted to know what you guys would say to see if i am about right.
Thanks in advance
I have been asked to do three blocks of flats 2 houses and 2 bungalows.
Block 1 has around 85-100 windows average size most about 3ft 5ft
Block 2 very similar but about 60 windows of same size
Block 3 has around 20-30 windows again about the same size
I roughly know what i will charge on bungalows etc but could do with some real help on the blocks of flats.
I have added a pic of one the front of the biggest block the back is the same each of the sides of the block has about 9 of the smaller windows and 3 of the 3 pain windows.
What sort of prices would you guys be charging?
Prices for the biggest (pictured) block is fine or if you like a price on whole job?
I know it is hard to say but my first big contract that i could really do with now so want to make sure i get it right.
Oh it is monthly clean and will be a 12 monthly contract.
Any suggestions about contracts etc welcome not had one before no idea of the formalities etc.
Oh another thing is i will have to get a new pole if i get this job as my slx 25 is not high enough i need like another 5-10ft can i just get another bigger section to go on bottom to add that or will i need new pole.
I know it is a bit of an ask but need to get back to them ASAP and don't want to royally F the price up, i know roughly what i would charge but wanted to know what you guys would say to see if i am about right.
Thanks in advance