Over last cpl of months Iv picked up a hell of a lot of terraced house were its hard work gettin to backs. At moment I'm having to drive van down awkward back streets thts time consuming. In certain streets I have like 4 or 5 fronts and maybe 2 of those I have to do the backs
I'm thinking along lines of getting a pack pack for lad who I have working with me to use to go do backs of terraced while I do front. Just not sure if that's way to go as I'm thinking it will be time consuming having to fill up all time so maybe I won't actually be saving any time on what I already do..
Suggestions folks would be great
I'm thinking along lines of getting a pack pack for lad who I have working with me to use to go do backs of terraced while I do front. Just not sure if that's way to go as I'm thinking it will be time consuming having to fill up all time so maybe I won't actually be saving any time on what I already do..
Suggestions folks would be great