- Messages
- 11,677
- Location
- Sunderland Tyne and Wear
This is the type of job a 45cm brush would save you hours. When you zoom in you get a better idea of the scale. Still would do it in stages. 2 and a half days doing internals would do my head in.It's not a 2 day job. The outside is between one and one and a half days, I blast over with the wfp connected to an outside tap and rinse with pure. The inside is 2 and a half days. It's all the bars that take so long, and on the outside there are sections where muck gets trapped and I need to blast away and flick it out.
Inside there is so much framing to wipe over, there are also two glass diving walls inside to be cleaned on both sides.
On the plus side, the tomatoes are the sweetest I've ever eaten and there's an orchard full of the best apples I've ever tasted. "Help yourself" was the message from the owner.
The house is fantastic, one of my best jobs £80 and takes just over an hour.
Greenhouse gets done twice a year.