I think of myself as an efficient worker, therefore fast, but I do worry that my customers
won’t like it if I’m too fast, so I will tend, sometimes, to slow down a bit. I was working one
day last week when a windy I know (wfp) came along, we stopped and chatted, and then
went back to work. He did one front with a double bay up and down and a three bed
detached all round in fifteen minutes. £5 and £10. As it happens I saw him again today,
and as we were talking he mentioned that he charged a pound a minute. So I thought,
sod that, and I’ve been working at full speed today, and will so in the future.
won’t like it if I’m too fast, so I will tend, sometimes, to slow down a bit. I was working one
day last week when a windy I know (wfp) came along, we stopped and chatted, and then
went back to work. He did one front with a double bay up and down and a three bed
detached all round in fifteen minutes. £5 and £10. As it happens I saw him again today,
and as we were talking he mentioned that he charged a pound a minute. So I thought,
sod that, and I’ve been working at full speed today, and will so in the future.